Completed designer home in new estate in Mango Hill

July 25, 2018
Peter Jones Constructions

This beautiful home was built for parents of clients Peter has previously built for.  It will suit them right down to the ground as it was custom designed to suit their requirements and block of land.

Having 4 bedrooms, 2 bathrooms and a powder room, and a large family/dining/kitchen combined area leading out to the alfresco, it will be an entertainers delight.

Thanks again to Peter’s team.

11
1
1
1

From the vacant land to the finished home – watch the home being created………..


1 – Photos of the site


2 – Foundations in ready for slab prep.


3 – Slab poured.


4 – Carpenters working away on the frame – we use Cypress timber as it is naturally termite resistant. We also use Glass Guard termite barrier so you get extra peace of mind for whole house protection.


5 – Frame completed and roof trusses going up.


6 – First photo is looking out through where the corner stacker door will go onto the patio. Roof completed, sarking on and windows in – ready for plasterers and bricklayers.


7 – Bricklayers have started.


8 – Plasterers are working away nicely – a few more days and we will be ready for the kitchen installation.


9 – House is looking great – moving along nicely.


10 – Benchtops are on now – kitchen is massive and looks great.


11 – Home is now completed and looks amazing – a couple of photos of front and the wonderful kitchen.


111
111
Read More

Making the most of a steep block at Cashmere – see this incredible home being built

May 16, 2018
Peter Jones Constructions

We are always up to a challenge, so when the clients brought their sketch plan to me to quote, I thought what a great home this will be, but gee there will be lots of work to get this home to its full potential.

But I’m definitely up for it!!

 

During the design processes, to minimize site cut, the home has been designed to have 5 different levels to work with the slope of the land. The advantages are that all the bedrooms and living area are on the same level, leading onto a massive alfresco overlooking a nature reserve.

We started with this slope…..

and ended up with this amazing home……

 

11
1
1
1

Follow the numbers to follow the construction progress:

1 – Site cut is underway.


2 – With the steep site – there were a few retaining walls that needed to be built before we could proceed. These are up now and looking great.
A couple of massive weeks ahead getting to floor stage.


3 – Plumbers are getting the underslab drainage in ready for foundations.


4 – Massive day getting the footings and steel columns in – ready for the raised floor.


5 – The garage here has an intergrated retaining wall that needs blocks laid before we can pour the slab. As the garage will be 1 metre higher than the living area.


6 – Slab has been prepared – ready to pour.


7 – Carpenters have got a massive job ahead of them now, as there was over 20 tonnes of timber delivered (not including the roof trusses). Will be a wonderfully big home when it is completed!


8 – Carpenters have got the frame going along great.
It has been a massive job but with eight carpenters on site, all working well together, we have got through it quite fast.


9 – Job went from a massive pile of trusses on the ground to all being stood by lunch time. Well done team!


10 – It really give the home some shape with the skillion roofs at the front, going to a standard hip roof at the rear.

Ready for roof measure – can’t wait til the roof is on!


11 – Scaffolding going up ready for roofers – but what wonderful weather we are having for roofing a house?! Pretty sure the roof will be next week now.


12 – Frame is complete – roof is on – windows and sarking are installed. This is where we got to before Xmas.


13 – First job back after xmas and started installing cladding. There are some colourbond feature panels yet to be installed.


14 – Plasterers are working away – there is a lot of work to be completed in a home this size.


15 – The living areas and hall in this home have 140mm x 19mm Spotted Gum Tongue and Grove flooring – this is laid over the top of the particle board floor. It will get sanded and polished at the completion of the job and will look absolutely awesome.


16 – Flooring has been laid – looks awesome – the polish gets done after all the trades are finished.


17 – Guys from Aspen Cabinets are installing the cabinetry – the kitchen looks out a massive bi-fold door straight onto the deck.


18 – Tilers are working away – doing another great job.
The tile clips being used for the porcelain rectified edge tiles bring them to a perfectly flat surface on top – creating an awesome job.


19 – Outside is coming up a treat – will look amazing once the scaffolding comes down.
Decking to be laid is next on the list of jobs to be completed. Can’t wait to see that!


20 – Tiling is now complete – all the wet areas are tiled to the ceiling with large porcelain tiles. The kitchen splash back tiles are massive being 1.2m x .6m – these are the largest tiles we have laid to date.


21 – Timber stairs are now in – the home is now ready to be painted inside. Will follow soon with some inside pictures.


22 – I love this house – what a deck to be entertaining on.


23 – Picture of each end of the house – this gives an idea of the slope of the block.


24 – Home is now completed – looks amazing. Well done to all the team. Some photos of outside. Deck is fantastic!


25 – Amazing home finished – some photos of completed inside.


WELL DONE TEAM!


111
111
Read More

Home completed for couple nearing retirement who wanted it all – follow the build

February 21, 2018
Peter Jones Constructions

Custom designed home in boutique estate in Beerburrum has been completed.

This home was designed by my clients to suit their lifestyle.

It has separate lounge and separate dining areas with a combined kitchen/family meals area.

It has a craft room for her and a study for him, as well as three bedrooms and a massive garage.

The alfresco will catch the cooling afternoon breeze.

What a home it is!

11
1
1
1

This is a lovely home – watch it take shape ………..


1 – Below is the original block and then the site being prepared for the slab.


2 – Site cut and footings have now been completed.


3 – Couple of photos of the slab prep underway and slab being poured.
We use a traditional style footing and slab – no Coolite boxes on my jobs!


4 – Carpenters are working away on the frame – can see how the house starts to take shape.


5 – Frame is now completed and roof is under way.


6 – After many delays from the rains we have had, the bricklaying is now completed. It is starting to look more like a house.


7 – A couple photos here of the plastering at different stages.


8 – Finely a week of dry weather, so now the drainage has been completed including the installation of the Taylex treatment plant.


9 – Cabinet makers are installing the cabinetry – won’t be long and we will be ready for tiling.


10 – Bathroom and ensuite are looking great now that the tiling is underway.


11 – A bit hard to see in the photos but this house has picture rail mounted on several walls – this makes it much easier to hang your favourite photos.


12 – Painting is underway – working on getting this home completed by Christmas – owners are eagerly awaiting the handover of their new home.


13 – Home completed, on time, on budget, with happy clients!

Handover completed before Xmas, ready for them to move in.

Some photos show the amazing finish – enjoy!


111
111
Read More

Beautiful Golden Beach Home For Return Clients Completed

November 30, 2017
Peter Jones Constructions

It was great to build for these wonderful clients again. This was the second home I have built for them.

This being low set and a bit smaller than their last home.

 

Their new home has a massive family / dining / kitchen area,

with the alfresco overlooking the pool.

It has three bedrooms with a study and an enormous ensuite with spa.

All within easy walking distance to Pumicestone Passage and Caloundra on the Sunshine Coast.

11
1
1
1

This is a beautiful home – see it being built ………..


1 – Below is the original block and then the site being prepared for the slab.


2 – Being a narrow block, the pool had to be built before the slab was poured. So the pool builders worked on the shell before the house was even started.  With the ground being so sandy and having a high water table, the pool builders had a great deal of trouble.


3 – This job progressed swiftly so here are just a selection of photos showing you the progress.


4 – This home is continuing to progress quickly, so following are a few more photos showing the progress.


5 – As you can see the house is looking great – clients couldn’t wait to move in and we were not that far from being finished – it’s going to be a beautiful house when it’s completed.
Tilers starting soon.


6 – House is nearing completion – concretors are getting the drive way ready.

 


7 – This appealing home is really near completion. Here are a few photos showing how fabulous it is looking inside.


8 – So near completion – a few of the outside photos.


9 – Here it is completed – wow it looks great and the clients are so happy to be spending Christmas here – creating more memories in their new home.  Enjoy!


111
111
Read More

Beautiful designer home completed in North Harbour Estate

October 18, 2017
Peter Jones Constructions

It’s wonderful to see a unique modern house being built – from the vacant block to the finished home – and then seeing the elated clients.

We have proudly finished this family home in North Harbour Estate at Burpengary – great work team.

 

11
1
1
1

From the vacant land to the finished home – watch the home being created………..


1 – Another new home begins construction.


2 – Underslab has been completed – now ready for concretors to start.


3 – Digging and pouring the foundations.


4 – Slab being poured and completed.


5 – Slab poured – ready for timber delivery and for the carpenters to start.


6 – Carpenters have been working between rain showers this week and have the frame up almost ready for trusses.


7 – Frame is up and trusses have been delivered to site.


8 – Carpenters are working on installing trusses.


9 – Frame and trusses completed – ready for roofing.


10 – Plumbing pipework has been installed. We only use copper water piping as it has been tried and tested over the years.


11 – Roofing has started – will look great when it is all done.
I love the look of the skillion roof.


12 – This home is now ready for bricklayers and plasterers – it’s moving along well.


13 – Bricklayers working along well – won’t be long until the renderer arrives!


14 – Bricklaying has been completed – place is looking great – ready for rendering.


15 – Cabinetry being installed – can’t wait to see it all completed.


16 – Kitchen install is now complete – really taking shape.


17 – Vanities look great – lots of draws in these vanities – thanks again Aspen Cabinets for a great job.  Looking forward to seeing the tiling completed.


18 – Exterior is now ready for painting.
Will look great as this house has excellent street appeal and character.


19 – Boomerang Pools have just started installing the pool which is going in next to the alfresco area.   What a view it will be – sitting in the alfresco overlooking the pool!


20 – Painters are well underway, getting completed before the tiling starts.


21 – Was flicking through some photos and realised we haven’t put the completed photos of this beautiful home up – here are just a few…… clients are so happy and are now enjoying their new home.



111
111
Read More

Custom built home for young family in Caboolture recently completed

October 4, 2017
Peter Jones Constructions

This great family home was completed recently in Caboolture – thanks again to Peter’s team.

The clients were over the moon.

 See how the home took shape with the following step by step building process.

11
1
1
1

From the vacant land to the finished home – watch the home being created………..


1 – When we tried to start this new home and get the slab poured, it had been raining heavily.  So unfortunately we had to wait until nice dry days returned to start (no complaints from Peter though as we had badly needed the rain).


2 – Under slab drainage has been completed and the concretors are starting on the footings.


3 – Concretors are preparing the slab – the job dried out really well since the massive rain last week.


4 – Finally got a great dry day to pour the slab.


5 – Slab completed ready for timber delivery and carpenters.


6 – Frame is up ready for fascia and gutter and roof.


7 – Roof is going on – house is really starting to take shape.


8 – Brick work is going up – starting to look like a house.


9 – Plasterboard is going up – almost ready for kitchen installation and carpenters fix out.


10 – Cabinetry and tiling photos follow.


11 – We have finished this great family home – clients are really happy with how it looks.  Just before hand over I took these photos.


111
111
Read More

Striking home completed at Moorina – steep block overlooking creek

July 21, 2017
Peter Jones Constructions

On Friday I had the pleasure of doing final handover to the owners of this property.

Keys were handed over and all the stresses of colour choices, vanities, bench tops and light fittings have all come together and the end product is this beautiful, one of a kind, designed to their own desires family home.

11
1
1
1

I’d like to thank all my trades and team for working together for another great finish.

Jason and Michelle we hope you love your new family home and make many memories there.

Here are a few before and after photos for you to have a look at, from the beginning to end.



 

 

111
111
Read More

Fantastic Rural Home At Mount Archer Completed – Summary of Construction Work Follows

June 14, 2017
Peter Jones Constructions

Peter’s team completed a fantastic home at Mount Archer recently – following is a snap shot of the building process that took place over the last couple of months.

11
1
1
1

Follow the numbers to see the home being created………..


1 – The set out begins.


2 – Footings and slab have now been competed – just awaiting the frame delivery.


3 – Slab has been finished now and the timber has been delivered ready for the carpenters to start work.


4 – Carpenters have put the frame up in great time and the trusses are now on site ready to be installed.


5 – Crane lifting trusses to carpenters as they assemble the roof framing.


6 – Trusses now completed and carpenters are not far from finishing the frame.


7 – Sarking and windows are now installed. Plumbing and electrical roughins are now being done. Roofing has been completed.  Brick are due any day.


8 – In this photo is a massive pile of insulation to be installed in the ceiling before the plasterboard goes up.

We always use an R2.5 polyester batt on our ceilings as it helps cool the living areas in summer and keeps the warmth in winter.


9 – A few progress shots of the brickwork – the day the brickies started it was raining and a few days later when they finished it was sweltering hot – poor guys!


10 – Photo showing you the family room/kitchen now the plasterboard has been installed.


11 – Carpenters are inside installing doors, architraves and shelving.


12 – Cabinetry has been installed – this is a massive kitchen with loads of work areas.


13 – Drainage and treatment plant are going in.


14 – Finished this home a while ago but forgot my camera. I ducked up late one afternoon last week and took a couple of photos of the finished product. Looks great with the grass starting to grow!


111
111
Read More

Another new home in Upper Caboolture is finished – Summary of Construction

March 15, 2017
Peter Jones Constructions

We are very proud to have finished the construction of another new home in Upper Caboolture. The clients couldn’t wait to move in!

Following is a summary of the Facebook posts showing the home from set out to hand over.  Just follow the numbers to follow the construction stages.

11
1
1
1

Start Here….

1 – We are busy at the moment and this new home has just been started as well. The set out and the electrical lead has happened.


2 – The plumbers are laying the pipes.


3 – The next stage is that the footings are concreted in.


4 – The slab preparation is now completed and slab is being poured. The carpenters were able to get onto the slab the next day and get a start on the frame.


5 – Carpenters are well under way on the frame.

Crane is placing the roof trusses in position.

Frame completed and ready for fascias and gutters and roofing.


6 – Carpenters have completed the frame including installing the ceiling battons.

Plumbers installing their copper piping inside the walls.


7 – Roofer is working hard at installing the roof.


8 – Frame is now completed and plumber and electrician are installing services inside the walls.

The media room has sound insulation installed in the walls and ceiling so they can really crank up the sound while watching their movies.


9 – Plaster board and windows are now on site ready for installation.

Roof has now been completed, bricks are delivered and ready for the bricklayers to arrive.


10 – Brick layers are working along nicely. It is now starting to look like a home.


11 – Plasterers have sheeted and are now in the process of setting the joints. This makes the inside really start to take shape.


12 – Carpenters are now installing patio ceilings and eaves linings.


13 – Carpenters are working inside – fitting doors and architraves.


14 – Wet-seal is a water proof membrane installed behind the tiles to stop any water leaks. This has now been completed in wet areas and shower recesses.


15 – Painters are working through at the moment, big house ahead of them.


16 – Kitchen has been installed.


17 – Another home almost complete. Driveways have been poured now – not long til handover.


18 – Another home completed – just waiting for handover. The clients can’t wait to be in their new home.


111
111
Read More

Elimbah Outdoors Family Home

April 21, 2016
Peter Jones Constructions

Elimbah family love their outdoors home

This great family home was designed to maximize their large block and their love of the outdoors.

11
1
1
1

Another Custom Built Home by Peter Jones Constructions

The Story of the Build

The Customer Story

111
Peter -1

The client had two main priorities – maximizing their huge block of land at Elimbah with a house which would cater for their 6 children and making the outdoors seem to come inside.  This was readily achieved using Peter’s expertise and creativity.  Peter built a 7 bedroom, 3 bathroom and 3 separate living area home.  This allowed everyone to have their own space, but also allowed the client plenty of room for the pool, shed and boys toys.

Peter -3

The central point of this home is the kitchen and living room. Bi-fold doors have been installed which when fully opened allows the outdoor area to be part of the home.

Peter -2

The client has been thrilled with this outside/inside area as the fly-screens fully protect everyone in the evening when the adults are enjoying some refreshments and the children are playing in the pool.

111
1111
Read More